C# - Calculate StartDate When End Date & Back Days Given?

May 5, 2011

I am developing c#.net solution where i have to calculate Start Date based on provided End date and Duration (back days) without weekends.

i.e. End Date: 05/5/2011
Back days: 5
Start Date = (05/5/2011) - 5 days (Excludes weekends)
Start Date = 29/04/2011

View 3 Replies


ADVERTISEMENT

Calculate StartDate & Time?

Nov 24, 2011

I want to do 2 things with date & time calculation : First : I have a LastSave (dateTime Format). I have two controls (NumericUpDown / Format Decimal), one for Hours, the other for Minutes.I want to start another save at a specific time this day at : Today's date + Hours + Minutes.What i've done isn't work, cause i can't convert to DateTime my setting

DateDernireSauvegarde, which has a STRING FORMAT.
Private Sub TimerSauvegarde_Tick(sender As System.Object, _
e As System.EventArgs) Handles TimerSauvegarde.Tick

[code].....

View 1 Replies

2005 - Subtract A Date From The (current Date Minus 7 Days) And Produce A Number Of Days?

Sep 28, 2010

I have a date in the future e.g. 13/10/2008 I need to subtract the current date (today is the 28/09/2010) minus 7 days, so thats 21/09/2010 minus 13/10/2008, which would equal erm, 720 something ? But the current date won't always be 28/09/2010, obviously. I need the code for this. EDIT: When i said future I mean past :)

View 3 Replies

Scroll Back In Time X Days Or X Days Forward?

Apr 15, 2012

I need this for 2 different changes.ON one form i got a week calendar, the other a month calendar.Was hoping to add 2 buttons previous & next.To scroll back in time x days, or x days forward.And similar for the months, but instead of days months.Can anybody give me a exaple or a method how to get this to work?Figured it could be done with a loop, but not sure anymore.

View 2 Replies

Use A DateTimePicker Instead Of A Fixed Date On My StartDate?

Apr 14, 2010

From part of the code below where it say`s "Dim
startDate As DateTime =
New DateTime(2010, 4, 9)"

How can I insert a DateTimePicker, So I can choose a date instead of inserting date (2010, 4, 9)I have done a lot of seaching on this problem with no result.Basicaly I want to use a dateTimePicker instead of a fixed date on my startDate (fisrt date of year).

Private
Sub Timer4_Tick(ByVal sender
As System.Object, ByVal e
As System.EventArgs) Handles Timer4.Tick[code].....

View 4 Replies

Asp.net - To Calculate Days In A Month

Mar 31, 2009

i have a textbox that displays date in format,for eg:March,20,2008.Then i need to get total days n march in year 2008.

View 4 Replies

Calculate Days In Datagridview?

Apr 23, 2010

I have a datagrid in VB2008 currently set up with a column that has dates. I want to be able to calculate the number of calendar days of the Disp Date Column to today's date. Almost like the days360 formula in Excel. I cannot do it in Access as it is a linked data table and cannot do it in excel as the spreadsheet is being updated by the server throughout the day.

[Code]...

View 13 Replies

Calculate Days Of A Month?

Apr 20, 2010

there is any method for calculate days of a month?

View 4 Replies

Calculate Values Of Days

Jun 25, 2009

How can I calculate the values in a date. [code]

View 4 Replies

Calculate Number Of Days Between Two Dates?

May 11, 2009

how can i calculate number of days between two dates.....for xample between 24/12/2009

View 9 Replies

Calculate Number Of Moths Between Two Days?

Nov 3, 2010

How to code to calculate number of moths between two days? For example, BeginingDt=09/01/2007, EndingDt=05/20/2009 should be list as below:

2007:4
2008:12
2009:5

(If date of month >=15 will count as whole month, if <15 will be ignored)

View 6 Replies

Calculate Total Salary According To Attending Days?

Aug 15, 2011

i want to calculate total salary according to attending days.

View 5 Replies

Function To Calculate Days Number Between 2 Dates?

Jan 1, 2012

i want a function to calculate days number between 2 dates

for example :

start date = 2011/11/13
end date = 2012/01/02

i want months to be 30 days always .

thats mean
18 days in November
30 days in December
2 days in January
sum = 50 days

View 4 Replies

Date Method - Calculate The Number Of Years For My Calculate Age Event Handler

Mar 30, 2009

I am trying to calculate the number of years for my calculate age event handler, however i am apparently missing a method or whatnot because im trying to calculate the age , can anyone suggest help on this. I need to subtract years to get my age but when i try the birthdate.Subtract (currentDate) method i get an error about not able to convert from LONG?

So below is what I have.

Private Sub btnCalculateAge_Click(ByVal sender As System.Object, ByVal e As System.EventArgs) Handles btnCalculateAge.Click
Dim currentDate As Date
Dim BirthDate As Date
Dim Age As Long

[CODE]

View 7 Replies

Asp.net - Calculate The Difference Between Two Dates To Display As A Number In Days (VB)?

Nov 20, 2011

How do I calculate the difference between two dates to display as a number in days?I have 2 text boxes (txtHStart_Date & txtHEnd_Date) I have used an Ajax Calendar Extender to enter the dates in each of these text boxes.I would like to get the difference between these two dates to show in a seperate text box (txtNoOfDays)

I've seen the timespan function but can seem to get this to work. I'm not to sure how to declare the text boxes as the dates I would the calculation to be made from

Code:

Dim D1 As Date
Dim D2 As Date
Dim ts As New TimeSpan
D1 = txtHStart_Date.Text
D2 = txtHEnd_Date.Text
ts = D2 - D1

But I know this isn't right. I also don't know how to get it to display in the 3rd TextBox.

View 3 Replies

Present Days Date To The Selected End Date?

Sep 4, 2010

Lets say i had a label with 9/6/2010 11:59:99 that was selected from the month calendar control, is there anyway to determine how many days are from the present days date to the selected end date?

so 9/4 to 9/6 = 2 days

The "2" days is the value im seeking

View 6 Replies

Use The DateTimePicker To Extract Days Diff From A Date Selected On DateTimePicker1 To A Date Selected On DateTimePicker2?

Mar 4, 2009

I am traying to use the DateTimePicker to extract days diff from a date selected on DateTimePicker1 to a date selected on DateTimePicker2. I have no problem substracting the daydiff in numbers of days. The problem I have is that I need the DateTimePicker to tell me how many of those days are weekends (friday, saturday) and how many are weekdays.

View 2 Replies

Add Days To A Date?

May 13, 2011

The date is actually a string being read in from a text file in the format

MM/dd/yyyy

how can i add 7 days onto the date?

View 1 Replies

Any Way To Add 10 Days To Current Date?

Nov 19, 2010

If I know that today is 236th day of the year, how can I get what date is for 236 + 10 = 246th day of the year?

View 3 Replies

Subtracting Days From A Given Date?

Feb 11, 2012

I have a DateTimePicker (dtBBDate) and a textbox(txtDBBDate) object in my form....but what i want when user change the date of dtBBDate my text box should show show the date 10 days minus from that selected date i.e. if user select 10 may text box should show me 1st may?

View 2 Replies

Adding Working Days To Date

Mar 17, 2011

In my project, i need to add days to a given date. but when adding the days it should not have saturdays and sundays.

View 3 Replies

Calculating Business Days End Date?

Jun 22, 2012

I need to calculate the end date given the number of business days (excluding weekend and holidays). All the examples I've seen so far return the number of business days between a start date and an end date.

View 1 Replies

Date Checker Every 15 Days Paid?

Mar 15, 2012

I just wanna know what is the way of tracking the record of employee when i save theyre info in payroll. Like if the employee got paid in these date lets just say he will get paid every 15 days of his work not including sat and sunday. If i save the info the error will say."You have been paid on this day / week" .All i got is save the info but when it comes to checking i cant do it

View 5 Replies

Get Number Of Days Between A Start And End Date

May 28, 2010

Is there a method or function that I can use to get the number of days between a start date and end date? I tried using Timespan, but I was noyt able to convert the value to a string. What I am doing is I have 3 text boxes. 1 with start date value user will set using a calendar. And another with end date set using a calendar.And the 3rd text box is being used to display that difference between the two dates.

View 3 Replies

'calculate' Date In Vb2005 With Date (VB 2005)?

Jun 25, 2009

there, im doing a leave management system with vb 2005..and here's my problem -how do i 'find' the expiry date?? eg: from the datetimepicker in my form, if the date i select is 1st january 2009.....how do i type the code to find the expiry date 1 year later (which is 1st january 2010) and display the date in a textbox in my form???

View 1 Replies

Counting Number Of Days From Date Column?

Mar 8, 2010

I have a datatable that stores information on employees. What i'm trying to do is use it to run a seniority list looping through the table using the current system date. The looping part i have no problem with, and the system date calculation also i know how to do. The problem call the date from the startDate column to do the calculation.

i have tried

dim sDate As date = "startdate"

but i get an error that it cannot be converted to date.

View 11 Replies

Display All Days Base On A Date Range?

Feb 15, 2011

I have to display all days base on a date range. For example my date range is "January 1, 2011" to "February 28, 2011". Now what i want is to display all the dates base on that range, what i meant about "display the dates" is like this.

January 1,2011
January 2,2011
January 3,2011

[Code]....

View 3 Replies

Get Total Number Of Days From 1st Jan To Date You Choose?

Apr 30, 2010

on my design i have a listbox, datetimePicker and a button. how do i pick a date like for example 14 feb 2010 from the datetimePicker and click the button, then the listbox showing how many days from 1st jan 2010? should be 45days.

View 19 Replies

VS 2005 Display All The Days With The Date Of That Month?

Apr 19, 2009

hi..how can i select a month..and display all the days with the date of that month from month calender...

View 1 Replies

DB/Reporting :: Calculate Rate For 3 Days In Different Rate Like Public Holiday,weekend And Normal For 1 Room?

Aug 19, 2009

how to calculate rate for 3 days in different rate like public holiday,weekend and normal for 1 room

View 2 Replies







Copyrights 2005-15 www.BigResource.com, All rights reserved