Get Number Of Days Between A Start And End Date

May 28, 2010

Is there a method or function that I can use to get the number of days between a start date and end date? I tried using Timespan, but I was noyt able to convert the value to a string. What I am doing is I have 3 text boxes. 1 with start date value user will set using a calendar. And another with end date set using a calendar.And the 3rd text box is being used to display that difference between the two dates.

View 3 Replies


ADVERTISEMENT

2005 - Subtract A Date From The (current Date Minus 7 Days) And Produce A Number Of Days?

Sep 28, 2010

I have a date in the future e.g. 13/10/2008 I need to subtract the current date (today is the 28/09/2010) minus 7 days, so thats 21/09/2010 minus 13/10/2008, which would equal erm, 720 something ? But the current date won't always be 28/09/2010, obviously. I need the code for this. EDIT: When i said future I mean past :)

View 3 Replies

Adding Business Days To Start Date Including Holidays

Aug 5, 2012

I read that .Net has no function equivalent to Excel's "Workdays" function, which adds a specified number of workdays to a startdate, including an array of holidays. I managed to find a function that adds the number of workdays to the startdate, but I am having no luck telling the function to add a day to the start date for each holiday within the date range. I've pasted a self-contained function below. Every time I compare the result against the Excel result, it's not adding up.

Private Function CalcEndWD_5wkd(StartDate As Date, WD As Integer) As Date
Dim Holidays(23) As Date
Holidays(0) = #10/5/2012#
Holidays(1) = #11/12/2012#
Holidays(2) = #11/21/2012#
[Code] .....

View 4 Replies

Counting Number Of Days From Date Column?

Mar 8, 2010

I have a datatable that stores information on employees. What i'm trying to do is use it to run a seniority list looping through the table using the current system date. The looping part i have no problem with, and the system date calculation also i know how to do. The problem call the date from the startDate column to do the calculation.

i have tried

dim sDate As date = "startdate"

but i get an error that it cannot be converted to date.

View 11 Replies

Get Total Number Of Days From 1st Jan To Date You Choose?

Apr 30, 2010

on my design i have a listbox, datetimePicker and a button. how do i pick a date like for example 14 feb 2010 from the datetimePicker and click the button, then the listbox showing how many days from 1st jan 2010? should be 45days.

View 19 Replies

Get The Current Number Of Usage Days, Unique Usage Days, Etc In An Evaluation License Using CryptoLicensing Generator?

Jan 25, 2010

Get the current number of usage days, unique usage days, etc in an evaluation license using CryptoLicensing Generator.

View 1 Replies

Present Days Date To The Selected End Date?

Sep 4, 2010

Lets say i had a label with 9/6/2010 11:59:99 that was selected from the month calendar control, is there anyway to determine how many days are from the present days date to the selected end date?

so 9/4 to 9/6 = 2 days

The "2" days is the value im seeking

View 6 Replies

Calculate The Start And End Date Of A Week Given The Week Number And Year In C# (based On The ISO Specification)?

Aug 4, 2009

I need to generate a report that shows the 52 weeks of a year (or 53 weeks as some years have) and their start and end dates. There is an ISO spec to do this but seems awfully complicated! Im hoping someone knows of a way to do it in C# or Visual Basic (its actually for Visual Basic 6 but I will try port it across)

View 7 Replies

Use The DateTimePicker To Extract Days Diff From A Date Selected On DateTimePicker1 To A Date Selected On DateTimePicker2?

Mar 4, 2009

I am traying to use the DateTimePicker to extract days diff from a date selected on DateTimePicker1 to a date selected on DateTimePicker2. I have no problem substracting the daydiff in numbers of days. The problem I have is that I need the DateTimePicker to tell me how many of those days are weekends (friday, saturday) and how many are weekdays.

View 2 Replies

Add Days To A Date?

May 13, 2011

The date is actually a string being read in from a text file in the format

MM/dd/yyyy

how can i add 7 days onto the date?

View 1 Replies

Any Way To Add 10 Days To Current Date?

Nov 19, 2010

If I know that today is 236th day of the year, how can I get what date is for 236 + 10 = 246th day of the year?

View 3 Replies

Subtracting Days From A Given Date?

Feb 11, 2012

I have a DateTimePicker (dtBBDate) and a textbox(txtDBBDate) object in my form....but what i want when user change the date of dtBBDate my text box should show show the date 10 days minus from that selected date i.e. if user select 10 may text box should show me 1st may?

View 2 Replies

Getting The Number Of Days Between Two Dates

Nov 7, 2010

I'm trying to get, as the title says, the number of days between 2 dates. TextBox8 is set to a parsed version of the current date. The user has to enter the other date into TextBox7.Then I try to use this function that i made. The code does not work, I get an exception. I have never made a function before so I don't really know much about them. I honestly don't even know if this is possible,

[Code]...

View 5 Replies

How To Get Number Of Days In Month

Feb 27, 2009

I want to get number of days in a month. Here is my requirement if I am selecting month name in a combobox then I am displaying days in another combobox.
Example :
If I am selecting JAN in one combobox then 1 to 31 numbered bind to another combobox.
If I am seleing FEB in a ombobox 1 to 28 numbers added to the combobox.
I want to do this in vb.net (windows application).

View 1 Replies

Adding Working Days To Date

Mar 17, 2011

In my project, i need to add days to a given date. but when adding the days it should not have saturdays and sundays.

View 3 Replies

Calculating Business Days End Date?

Jun 22, 2012

I need to calculate the end date given the number of business days (excluding weekend and holidays). All the examples I've seen so far return the number of business days between a start date and an end date.

View 1 Replies

Date Checker Every 15 Days Paid?

Mar 15, 2012

I just wanna know what is the way of tracking the record of employee when i save theyre info in payroll. Like if the employee got paid in these date lets just say he will get paid every 15 days of his work not including sat and sunday. If i save the info the error will say."You have been paid on this day / week" .All i got is save the info but when it comes to checking i cant do it

View 5 Replies

Calculate Number Of Days Between Two Dates?

May 11, 2009

how can i calculate number of days between two dates.....for xample between 24/12/2009

View 9 Replies

Calculate Number Of Moths Between Two Days?

Nov 3, 2010

How to code to calculate number of moths between two days? For example, BeginingDt=09/01/2007, EndingDt=05/20/2009 should be list as below:

2007:4
2008:12
2009:5

(If date of month >=15 will count as whole month, if <15 will be ignored)

View 6 Replies

VS 2005 - How Many Number Of Days Between Two Dates

May 11, 2009

How can I calculate number of days between two dates. For example between 24/12/2009 and 29/12/2009. How can I know that how many days are there between these two dates?

View 4 Replies

VS 2008 Wait Certain Number Of Days?

Oct 14, 2009

Ok, say I have an application that has a setting called start. and when a button is pressed on the form, it puts a day in there or something, then the button becomes disabled. then when the application is opened 2 days (48 hours) later, the button becomes enabled for use again. How could I do this?

View 4 Replies

C# - Calculate StartDate When End Date & Back Days Given?

May 5, 2011

I am developing c#.net solution where i have to calculate Start Date based on provided End date and Duration (back days) without weekends.

i.e. End Date: 05/5/2011
Back days: 5
Start Date = (05/5/2011) - 5 days (Excludes weekends)
Start Date = 29/04/2011

View 3 Replies

Display All Days Base On A Date Range?

Feb 15, 2011

I have to display all days base on a date range. For example my date range is "January 1, 2011" to "February 28, 2011". Now what i want is to display all the dates base on that range, what i meant about "display the dates" is like this.

January 1,2011
January 2,2011
January 3,2011

[Code]....

View 3 Replies

VS 2005 Display All The Days With The Date Of That Month?

Apr 19, 2009

hi..how can i select a month..and display all the days with the date of that month from month calender...

View 1 Replies

Sql - Finding Start And End Dates From Date Numbers Table (Date Durations)?

Jun 19, 2009

I have two tables: a schedule table that contains information about how an employee is scheduled and a numbers table in which each number corresponds to a date.

[Code]...

I can do this on the SQL side or the code side. I have Linq at my disposal if I need it. The table doesn't need to be compiled by SQL. This will happen dynamically on a website and should be as efficient as possible.I don't want to have to iterate through each and look for breaks in contiguous days if I don't have to.

View 4 Replies

Displays The Number Of Days In A Specific Month?

Dec 9, 2009

I am supost to code a program for my homework using an one-dimensional array.in the program you enter the number of the moth and it gives you how many days are in that month. and I'm just kind of lost?

View 2 Replies

Function To Calculate Days Number Between 2 Dates?

Jan 1, 2012

i want a function to calculate days number between 2 dates

for example :

start date = 2011/11/13
end date = 2012/01/02

i want months to be 30 days always .

thats mean
18 days in November
30 days in December
2 days in January
sum = 50 days

View 4 Replies

VS 2005 Get The Count Of The Number Of Business Days?

Jun 8, 2009

I know the datediff function can give the count of the number of days between two different dates, but how can I get the count of the number of business days - i.e. Monday - Friday - between two dates?

View 2 Replies

VS 2010 Number Of Days In Billing Period?

Jul 19, 2011

If a billing period always starts on say the 22nd of the month and ends on the 21st of the following month then all I'd have to really figure out is how many days are in the month the billing period started right? I hate working with Dates! This is what I've come up with using the idea above...Note, Dates are strings in the first column of a Listview in the format of, mm/dd/yyyy.

' get month from start of billing period (last item in LV) ' example of dates: 06/22/2011
Dim BillStartMonth = CInt(ListView1.Items(ListView1.Items.Count - 1).Text.Substring(0, 2))
' get Year from start of billing period (last item in LV)

[code].....

View 2 Replies

Find Total Days Between Two Date Controls Selection

Jun 30, 2012

Protected Sub Calendar2_Selectionchanged(ByVal sender As Object, ByVal e As System.EventArgs) Handles Calendar2.Selectionchanged
Dim myDate1 As String = ""

[Code].....

Have to find total days from two date controls after selecting dates in two controls it should print total days by calculating after immediate selection of second date control

View 5 Replies